Writing
Write-ups from building this thing. Mostly about checks that cannot report failure.
- Every deploy said green. The scheduler was two weeks behind.
4 September 2026 · Five checks passed and the deleted job was still running. One service missing from one list.
- The enum value that had never been written
23 August 2026 · 27 branches skipped, every run still COMPLETED. The status field was not where the answer was.